ANGB RCx Phase 1 Final Report Bham B-550

Birmingham and Montgomery ANGBs

Retrocommissioning

Location: Birmingham/Montgomery, Al
Owner: Birmingham ANGB Montgomery ANGB

The RCx Performance Work Statement for the Investigative Phase 1 focused on the operation of all current Heating, Ventilation and Controls/Refrigeration (HVAC/R) equipment, Direct Digital Control (DDC) systems, energy using systems, building envelope and building loads with an emphasis on the identification of operations or conditions that significantly impact indoor environmental quality (IAQ), Current Facility Requirements (CFR), operability of the building or energy consumption.

SEA investigated eight (8) facilities investigated at the Birmingham location. The total annual savings anticipated from the 46 Quick Fixes at Birmingham ANGB that were implemented during the course of this investigative service are estimated to be approximately $23,500 (1,139 MBTU) for SPB equal to 6.45 years.

SEA investigated four (4) facilities at the Montgomery location. Total annual savings anticipated from the 19 Quick Fixes at Montgomery ANGB that were implemented during the course of this investigative service are estimated to be approximately $21,200 (708 MBTU) for SPB equal 4.12 years.

Back to Main Projects Page